Bridge Maintenance Worker

Bridge maintenance workers are based out in the field engaged in the repair, cleaning, sealing, painting, alteration and construction of highways, bridges and other areas as required.

Suggested pathway into bridge maintenance work:
  • Schools2Skills Certificate II in Civil Construction

Qualifications

On the job training
Accredited Certificate
Licence
Traineeship
Apprenticeship/Trade Certificate
Diploma/Advanced Diploma
Tertiary Degree
For further information see:

Back to Careers

The first Canning Bridge structure cost £425. The current structure is the fourth to be built and was completed in 1939 at a cost of £24,830.